Close

WhizzTanzania

Five Start

GET — On the Play Store

View
Back

DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING

Company: 
ZANZIBAR ELECTRICITY CORPORATION
Reference: 
TZ-ZECO-380710-CW-RFB
City: 
Tanzania
Closing Date: 
17/03/2025

Design, Supply, Installation, Testing And Commissioning Of 40 Mwh Battery Energy Storage System (Bess) In Mtoni.

Download the documents of the tender: 
Share with your friends: